SCHEIDT electrical installation

References

With best recommendation
Almost all SCHEIDT transformer stations leave the factories already fully electrically equipped. Because the concept of an integrated solution from a single source offers clear advantages and our substation and electrical expertise complement each other perfectly for you. The ideal basis for many successful projects.
NEK, equipped with 4.5 MVA transformer!
Photovoltaic park in Great Britain

Photovoltaic park in Great Britain

Request:

To complete a photovoltaic park, the task was to develop and plan walk-in 1 and 2-room stations with the customer, including taking over the entire logistics and completion on site. Authorised station width: max. 2.50 m!

SCHEIDT solution:
  • 1-room BEK, in which the transformer/inverter/switchgear are housed in a tested system in just one room (unique to date)
  • 2-room BEK as a building combination: Each station is always used if either the components are too large for one room or if they are not authorised due to the size of the building
  • Ensuring the correct assembly into a combination through the support of SCHEIDT specialist teams
Result:
Delivery and installation of all transformer stations within a very short time for the commissioning of the photovoltaic park, output: 50 MW.

NEK, equipped with 4.5 MVA transformer!

Request:
To operate a wind farm, the customer needed a transformer station with a significantly higher output and the smallest possible footprint.
SCHEIDT solution:
  • SCHEIDT SYSTEM NEK with 3 m width and 5 m length (low overall height), equipped with a 4.5 MVA transformer and switchgear
  • Reinforcement of the intermediate floor basement/station top section with special reinforcement and tested design to absorb the load-bearing capacity
Result:
Taking into account and fulfilling all customer requirements (non-accessible station building with the smallest possible footprint - also in terms of height), SCHEIDT developed a station that guarantees wind farm operation in a tested manner.

Transfer station for industrial use

Request:

Ensuring the transfer of energy from the power supply network to the consumer in compliance with special requirements. The special machines in use generate an overvoltage that must not enter the grid. It must also be ensured that the reactive power caused by electric motors is compensated.

SCHEIDT solution:
  • SCHEIDT SYSTEM BEK 300-630
  • Integrated MS billing measurement for direct billing with the supplier
  • Built-in special transformer 630 kVA
  • NSH distribution with 2 additional billing measurements for internal use
  • Equipped with compensation and mains filter systems
  • Customised design: with the option of subsequent connection to a wind farm
Result:
Transfer station of the highest concrete and electrical engineering quality, which shields the grid from undesirable external influences and ensures the customer/consumer a constant, demand-orientated energy flow and is flexible for future projects.

Certified quality and safety

The verifiable reliability of SCHEIDT's work for you is demonstrated by numerous certificates that repeatedly prove that our quality is excellent (here, for example: BG, TÜV NORD, Güteschutz Beton).

Smart Grid

SCHEIDT has taken up this challenge together with its partners from energy supply companies and industry - the result: Smart Grid - the intelligent grid stations!
Smart Grid

Smart Grid

Decentralised grid operation
en_GB