Big and grand even without a basement

BE - accessible without cellar

Walk-in Stations, Element construction without basement

Flexible production sizes and a wide range of applications characterise the BE stations from SCHEIDT. The BE walk-in transformer stations are prefabricated reinforced concrete buildings that leave nothing to be desired. They offer sufficient space to accommodate switchgear, transformers, metering and measuring equipment, for example. Turnkey.

Data on our BE stations

Structure and design

  • Reinforced concrete elements: Compressive strength class C35/45
  • The equipment components are operated/maintained in the dry, regardless of the weather

Roof

  • Cassette roof (also available as Green roof), optional: monopitch roof, pitched roof
  • Placed on elastomeric bearings (to avoid thermal stresses on walls)
  • UV-resistant, air-permeable filter foam (roof/wall sealing, under-roof ventilation)
  • Guidance against lateral displacement (pressure relief in the event of an arc fault)
  • If required: fixed roof/structure connection
  • Drainage via downpipe

Walls

  • Individually manufactured
  • Protectively welded to concrete floor in accordance with static specifications

Options and equipment

  • Adjustable transformer rails made of galvanised steel
  • Different door and ventilation grille sizes
  • Wall/roof ventilator possible if forced ventilation is required (standard: natural ventilation)
  • Sealing systems from various certified manufacturers (for cable and pipe penetration)

Structure assembly/composition

  • Carried out in the factory, if necessary on the construction site
  • Delivery/installation complete or separately in individual parts possible

Further turnkey stations

BEK

Walk-in station in element construction
with cellar

NZ

Non-accessible station in cell design (compact station)

NEK

Non-accessible station in element construction
with cellar

en_GB

Incoming goods note

Please note that our goods receiving department closes at the turn of the year as follows:
Rinteln and Hoyerswerda plant: on 19 December 2025 at 12:00 noon
Arnstadt plant: on 18 December 2025 at 2:00 p.m.
Goods acceptance will take place as usual in all plants from 12.01.2026.