As flexible as your requirements

SCHEIDT SYSTEM BEK

Walk-in Stations, Element construction with Basement (BEK)

Flexible production sizes and a wide range of applications characterise the SCHEIDT SYSTEM BEK, BE. The BEK (with basement) and BE (without basement) walk-in transformer stations are prefabricated reinforced concrete buildings that leave nothing to be desired. They offer sufficient space to accommodate switchgear, transformers, metering and measuring equipment, for example. Turnkey.

Data on Scheidt System BEK

Structure and design

  • Reinforced concrete elements: Compressive strength class C35/45
  • The equipment components are operated/maintained in the dry, regardless of the weather

Roof

  • Kassettendach (auch als Green roof), optional: Pultdach, Satteldach
  • Placed on elastomeric bearings (to avoid thermal stresses on walls)
  • UV-resistant, air-permeable filter foam (roof/wall sealing, under-roof ventilation)
  • Guidance against lateral displacement (pressure relief in the event of an arc fault)
  • If required: fixed roof/structure connection
  • Entwässerung über Fallrohr

Walls

  • Individually manufactured
  • Bei Option Betonzwischenboden: Schutzleitend verschweißt nach statischen Vorgaben

Intermediate floor

  • Raised intermediate shelf made of non-slip coated composite wood panels
  • Optional: 16 cm starker Stahlbeton-Boden
  • With all cable cut-outs for medium/low voltage and transformer connection
  • Access to cable cellar: approx. 60 x 60 cm, cover with 25 mm multiplex plywood panel, interlocking: arc-proof (2 sash locks)

Cable basement

  • Monolithic, produced without a construction joint in a single operation
  • Highest possible oil tightness without additional coating
  • Construction prevents seepage and water penetration
  • Frost-proof foundation pad
  • Adjustable transformer rails made of galvanised steel

Options and equipment

  • Different door and ventilation grille sizes
  • Wand-/Dachventilator möglich bei erforderlicher Zwangsentlüftung (Standard: natürliche Belüftung)
  • Oil collection surface with additional oil-resistant coating
  • Sealing of the basin with WHG-approved system
  • Sealing systems from various certified manufacturers (for cable and pipe penetration)

Structure assembly / composition

  • Carried out in the factory, if necessary on the construction site
  • Lieferung/Aufstellung komplett oder separat in Einzelteilen möglich

Further turnkey stations

SCHEIDT SYSTEM BE

Walk-in stations without basement

SCHEIDT SYSTEM NZ

Non-walk-in stations in cell construction

SCHEIDT SYSTEM NEK

Non-accessible element construction with basement